How to use it 01 Pick the member and enter its dimensions in metres; the panel shows the single-member volume and multiplies by the count. 02 Choose a mix preset. 1:1:2 through 1:4:8 set the cement : sand : stone parts and a typical water–cement ratio; editing any part switches the preset to custom. 03 Adjust the estimate. The dry-material factor, all three bulk densities, the bag size and the site-waste percentage are visible inputs rather than hidden constants. 04 Read the cards and warnings. Accent cards are the cement kilograms and the whole bags to buy; out-of-band factors produce an amber note instead of silently changing the total.
Worked readouts Six round columns, 0.45 m diameter and 3.2 m tall, at 1:1.5:3, w/c 0.45, 2% waste, 50 kg bags:
Card
The panel reads
Member volume × count
3.0536 m³ (0.50894 m³ each)
Wet volume incl. waste
3.1147 m³
Dry material volume
4.7966 m³
Cement
1,255.8 kg → 26 bags
Sand
1.3082 m³ ≈ 1,896.9 kg
Stone
2.6163 m³ ≈ 3,924.5 kg
Mixing water
565.13 L
A 5.2 × 3.6 × 0.10 m slab is 1.872 m³ . The same panel at 1:2:4 and 3% waste orders 610.84 kg of cement — 13 bags — while the leaner 1:3:6 preset orders 427.59 kg — 9 bags .
Why the dry volume is bigger than the hole The panel estimates in two steps. First the placed volume grows by the waste percentage, then it is multiplied by the dry-material factor — 1.54 by default, in the customary 1.50–1.57 band — because loose cement, sand and stone must also fill aggregate voids and be compacted. Only then does the mix ratio divide that dry volume: cement kg is the cement share times the cement bulk density (1,440 kg/m³ by default), bags round up to whole 50 kg bags, and water is the cement mass times the water–cement ratio. The stairs shape adds step triangles and a waist slab but not landings; add those as a separate slab.
Assumptions and limits
Take-off arithmetic, not mix design. The nominal ratios are field estimating conventions, not strength classes. A structural mix follows strength, exposure, code and a trial batch, and typical working water–cement ratios run 0.40–0.60 . Stair landings, formwork, reinforcement and pump losses are outside the count. What it does not do: it does not check members, design reinforcement or select a concrete grade — that is the structural calculator . Nor does it convert units; for other volume units use the volume converter .
Two ways to be short Apply 1:2:4 to that 1.872 m³ slab with 3% waste but without the 1.54 dry factor and the cement comes to about 397 kg — 8 bags . The panel orders 13 because it first works on the 1.54-times dry volume. A custom dry factor outside 1.50–1.57, or a water–cement ratio outside 0.35–0.70, raises a warning instead of adjusting the answer — worth reading before the order goes out.
Where it helps Ordering for repeated members Columns, footings and kerbs are the same calculation repeated: enter one member, set the count, and the bags, sand and stone come out as one list you can copy or send.
Comparing two mixes before buying The slab above shows the swing between presets: 13 bags at 1:2:4 against 9 at 1:3:6, with the same dry volume of 2.9694 m³ . Compare quantities first, then confirm the specification with the design side.
Privacy Dimensions, mixes and counts are processed in your browser; nothing is uploaded and the shopping list only leaves the device when you copy it.
References
Wikipedia, Water–cement ratio , en.wikipedia.org (访问日期:2026-10-07)— the working band behind the panel's default and warning range.
Wikipedia, Types of concrete , en.wikipedia.org (访问日期:2026-10-07)— why mix proportions follow strength and exposure rather than a single recipe.
ACI, ACI PRC-211.1-91: Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass Concrete , concrete.org (访问日期:2026-10-07)— the standard practice for proportioning, including trial-batch adjustment.
Calculators in this hub
Hand-picked tools, one click away. The mini versions compute live and carry your values into the full calculator.
Sources & review
Reviewed by CalcX Editorial Team
Updated 2026-10-07